Imaging the distribution of material for a given land size of 100000m². MOBA Xsite Pro performed the task in half the time with more precise finishing, meaning that the operator was able to exploit the height tolerance at a minimum level.Įspecially in large projects saving (even up to) 1cm of the material makes a huge cost difference. The result of the difference of both strips are significant: The second strip of 200 meters needed no surveyor but only MOBA Xsite Pro system installed on an excavator and processing needed tasks by moving independently. Afterward, the operator was using an excavator to follow the stakes of the surveyor to bring the material to grade and level. Traditionally means that first a surveyor was employed to stake out the needed height for each material (sand, small rock & big rock). They used a strip of 400 meters, whereas 200 meters were filled and leveled in a traditional way and 200 meters were being processed using MOBA Xsite Pro on their excavator. JFCC put the distribution of material to the test. The second layer is small rocks with sizes between 3-5 cm with an average height of 60 cm and the third layer of another 60 cm with big rocks sized between 10-15 cm. The first layer is sand with a height of approximately 80 cm. In total, the project compromises the creation of 3 lakes whereas the bottom must be filled with 3 layers of material. JFCC works with over 12 excavators and more than 20 trucks to ensure fast and efficient dig out. The Taiwanese company JFCC works on a project in the south of Taichung City to build a new water reservoir with a timeline of over 5-6 years. With MOBA you’re equipped with full visibility into depth, height, inclination, and bucket position. Xsite allows your team to program every dig in 2D and 3D applications, reducing up to 90 percent of the surveying work on your site. “The amazing people who visit XSite Braehead from near and far will have a great new venue to experience.Taiwan is the latest country where MOBA AG has introduced their 3D XSite Excavator control system to support companies working more efficiently and more accurately, - saving money, time, and rework. Naomi Dunkley, Operations Manager at Monterey Jack’s added, “XSite Braehead is a phenomenal site and we are very excited to bring the Monterey Jack’s brand to the center along with Dal and his team. “The Monterey Jack’s brand is right on trend offering the perfect combination of fresh, handcrafted, award-winning food and beverages at great value, perfect for the family-oriented XSite Braehead.” “It’s a fantastic leisure venue and perfect for this type of bar and restaurant. The re-opening will be managed and directed by Scottish restaurateur Dal Deol, who said: “I am delighted to be part of Monterey Jack’s new offering at XSite Braehead. It will operate a walk-in service for parties of fewer than six people, accepting bookings for tables of six or more. The opening will also create local jobs as officials plan to hire 30 people to run the new restaurant. The new 4,112 square foot restaurant, housed in a ground floor unit at the Renfrew location, will seat more than 150 guests and be open all day for casual dining. It will join the existing ten locations the brand already operates across Scotland.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |